Waste-to-Energy Plant of Shaoxing circular Ecological Industrial Park (phase II)

2X750t/d + N45MW

This project is a reconstruction project of Shaoxing Qingneng Environmental Protection Power Plant. Due to the early construction time of the old project, the treatment capacity of related technologies is relatively backward. In order to effectively solve the problems such as the rapid growth of waste and improve the environmental sanitation infrastructure in Shaoxing City and improve the reduction, recycling and harmless level of waste disposal, it is decided to rebuild the plant in other area and the old plant will be closed after the new plant is in operation. The construction of this plant not only solves the problem of waste disposal, but also has great significance to improve the overall treatment level of harmless, reduction and recycling of waste in Shaoxing City.